Chartered Surveyors , Geospatial Engineers
 
 
 
  • Homepage
  • Surveying Services
  • Project Gallery
  • About Us
  • Testimonials & Feedback
  • Topographical Survey
    • Topographical Survey
    • Cross & Long Sections
    • Areas & Volumes
    • Precise Levelling
    • Digital Terrain Models
  • Railway Survey
    • Experience & Expertise
    • Project Planning & Safety
    • Flexible Working
    • Tunnel Clearance Surveys
    • Railway Station Surveys
    • Rail Track Surveys
    • Overhead Line Equipment
    • Station Platform Surveys
    • Signal Sighting Surveys
    • Level Crossing Surveys
    • TGM Spigot Control
    • Bridge Structure Surveys
    • Clearoute Sections
    • Embankments & Cuttings
  • Highways Survey
    • Highways Surveying
    • Bridges Surveys
    • Excavations & Volumes
    • Junction Surveys
    • Metro Route Surveys
    • Tunnel Surveys
    • Visibility Splay Surveys
  • Building Survey
    • Floor Plans
    • Elevations
    • Roof Plans
    • Sections
    • Licencing Act 2003
  • 3D Modelling
  • 3D Laser Scanning
    • 3d Laser Scanning
    • Uses of 3D Scanning Data
    • Benefits of Scanning
    • Deliverables
    • Scanning Software
    • Point Cloud Visualisation
    • Links to Gallery
  • Photogrammetry
    • Aerial Photogrammetry
    • Terrestrial & Heritage
  • GPS & Survey Control
    • GPS / GNSS Control
    • Long Thin Surveys
  • Deformation Surveys
  • Additional Services
    • As Built Surveys
    • British Antarctic Survey
    • Confined Spaces Surveys
    • Environmental Agency
    • Engineering Surveys
    • Film Stage & Studio
    • Geotechnical Surveys
    • GIS Data Capture
    • Golf Course Surveys
    • Flood Mapping Surveys
    • Land Survey Consultancy
    • Overhead Cable Surveys
    • Pipeline Surveys
    • Power Transmission
    • Tree Surveys
    • Utilities Industry Surveys
    • Utility Location Surveys
Station Platform Surveys
  
The drive towards increasing network capacity has created the requirement to develop railway stations to accommodate longer, bigger and faster trains.

Longer trains create the need for platform extension surveys and faster, larger trains require platform canopy or coping stones to be modified to avoid any clashes or clearance issues with the envelope of the train.

In support of these projects we can supply:
  • Topographical & track surveys for platform extensions
  • Platform gauging clearance surveys at 5m centres in spreadsheet format
  • 3D strings for station canopy overhangs
  • Datum plate readings for reference
  • Drainage information
  • Underground utility location survey
  • Full 3D models for station buildings

With our comprehensive inventory of equipment and resources, we can cope with any size of project; from single platforms to multiple stations or framework agreements. We have a track record of delivering project data on time and on budget.

Examples of relevant experience include:

  • St Pancras station
  • Kings Cross station
  • Paddington station
  • Birmingham New Street station
  • Birmingham International
  • Chiltern Line platform extension surveys
  • Stafford Station tracks, platforms and buildings
  • Docklands Light Rail station surveys

Please call Nick Blenkarn or Mark Combes on 0844 880 8247 or e-mail webenquiry@severnpartnership.co.uk to discuss your project requirements.
 
Print Page ??
Return to Homepage
Contact ?