Chartered Surveyors , Geospatial Engineers
 
 
 
  • Homepage
  • Surveying Services
  • Project Gallery
  • About Us
  • Testimonials & Feedback
  • Topographical Survey
    • Topographical Survey
    • Cross & Long Sections
    • Areas & Volumes
    • Precise Levelling
    • Digital Terrain Models
  • Railway Survey
    • Experience & Expertise
    • Project Planning & Safety
    • Flexible Working
    • Tunnel Clearance Surveys
    • Railway Station Surveys
    • Rail Track Surveys
    • Overhead Line Equipment
    • Station Platform Surveys
    • Signal Sighting Surveys
    • Level Crossing Surveys
    • TGM Spigot Control
    • Bridge Structure Surveys
    • Clearoute Sections
    • Embankments & Cuttings
  • Highways Survey
    • Highways Surveying
    • Bridges Surveys
    • Excavations & Volumes
    • Junction Surveys
    • Metro Route Surveys
    • Tunnel Surveys
    • Visibility Splay Surveys
  • Building Survey
    • Floor Plans
    • Elevations
    • Roof Plans
    • Sections
    • Licencing Act 2003
  • 3D Modelling
  • 3D Laser Scanning
    • 3d Laser Scanning
    • Uses of 3D Scanning Data
    • Benefits of Scanning
    • Deliverables
    • Scanning Software
    • Point Cloud Visualisation
    • Links to Gallery
  • Photogrammetry
    • Aerial Photogrammetry
    • Terrestrial & Heritage
  • GPS & Survey Control
    • GPS / GNSS Control
    • Long Thin Surveys
  • Deformation Surveys
  • Additional Services
    • As Built Surveys
    • British Antarctic Survey
    • Confined Spaces Surveys
    • Environmental Agency
    • Engineering Surveys
    • Film Stage & Studio
    • Geotechnical Surveys
    • GIS Data Capture
    • Golf Course Surveys
    • Flood Mapping Surveys
    • Land Survey Consultancy
    • Overhead Cable Surveys
    • Pipeline Surveys
    • Power Transmission
    • Tree Surveys
    • Utilities Industry Surveys
    • Utility Location Surveys
Deformation & Movement Monitoring Surveys
  
At Severn Partnership, we can offer innovative and professional solutions to any given monitoring problem – such as:
  • Building deformation
  • Quarry faces
  • Highways - road surfaces
  • Embankment and cutting slopes
  • Active railway tracks
  • New gabion walls
  • Tunnel walls
  • Bridge parapets
  • OHLE gantries
  • Mining subsidence
  • Laser scanning for complex surfaces
  • Airport runways

We also can also join up with link up approved geotechnical engineers to proved borehole sampling, Piezometers and inclinometers.

Our service to you:

  • Innovative solutions to monitoring problems since 1991
  • All staff are PTS qualified, and we are Proof Audit / Linkup / BSI / TSA / RICS / ICES accredited
  • Cost effective construction of targets
  • Stable Monitoring Pillars contracted to minimise errors.
  • 24 hrs / day track monitoring (two or three surveyors working in rotation)
  • Hourly, daily, weekly or monthly intervals
  • Real time solutions available
  • Working countrywide
  • Using latest Trimble S6 magdrive robotic total stations for accuracy and efficiency

Monitoring visits are manned by surveyors with systems set up to provided checks on potential observational errors - making sure false alarms are not raised. We are well aware of the speed restriction / line blocking implications of track movement.

Since 1991, we have developed a particular specialisation in the field of remote monitoring of rail track during construction work. In 1997 we introduced a remote system and have been using it regularly ever since. Our remote system of monitoring can be fully automated for cost effective 24hour monitoring. All staff are PTS trained.

A sample of successful monitoring projects includes:

  • Crewe - UTX Pipe jacking below WCRM. 7 days, 80 targets, every 30mins.
  • Standish - UTX Pipe Jacking below WCRM. 5 days, 60 targets, every 30 mins.
  • Althorp embankment - Wooden stakes in sloping ground, monthly measurements for 1 year.
  • Bedford - Bridge structure monitoring, monthly for 2 years.
  • New Street Station - Stour Tunnel. 150 targets. Emergency monitoring regime every night for 8 weeks.
  • Paddington Station - Bishops Bridge Road project. Project surveyors on and & off for 2 years. Up to 300 monitoring targets total for tunnelling going under full width of station.
  • Llanelli - 2 sites on same project. 300 targets. Set up monitoring regime then taught client engineer to continue twice daily measurements. Ongoing project
  • Cardiff - 80 targets. Ongoing project. Measurements every 2 hours for 4-5 days.

All monitoring projects depend on a stable monitoring location. We build concrete pillars where possible. Our survey system checks the position of this survey station prior to each set of monitoring readings and makes use of the updated geospatial position; thus an unstable monitoring point will still produce good results.

Deliverables include:

  • Real time movement reports
  • Onsite spreadsheet analysis (X, Y, Z changes)
  • 3D DXF of rail alignment changes
  • Isopachyte contours for surface deviations (in ‘mm’ or ‘m’ depending on areas covered)
  • 3D scan clouds for complex surfaces – see laser scanning page
For clarification or further details or a detailed quotation please call us to discuss your requirements

Please call Nick Blenkarn or Mark Combes on 0844 880 8247 or e-mail webenquiry@severnpartnership.co.uk to discuss your project requirements.
 
Print Page ??
Return to Homepage
Contact ?